Start your bill, sign your waiver and check your insurance, in plain words.
Free, no sign-up. Use it now:
You: Start my April bill.
BuildProof: Your April bill is started. Pick the lines you worked on and enter how far along each one is.
April bill, Draft: Your contract $186,000.00; Billed so far $74,400.00; Left to bill $111,600.00. Button: Open my bill
You: Sign my waiver.
BuildProof: I can't sign for you. Your April waiver is ready: you sign it, then get it notarized.
April waiver, Ready for you: Through April 30; Amount $18,600.00. Button: Review and sign
You: When do I get paid?
BuildProof: Your March bill is marked paid. April is with the contractor for review, and I show a pay date only once one is recorded.
Where your bills stand, 1 paid: March bill Paid; April bill With the contractor
You: Is my insurance okay?
BuildProof: Yes. Your general liability and workers' comp certificates are current through March 3, 2027.
Your insurance, Current: General liability Through Mar 3, 2027; Workers' comp Through Mar 3, 2027
Example. Names and amounts are made up.
Say what you did this month. Your bill starts from your contract.
See what the job needs, sign your own waiver and keep your certificates current.
See what is approved, what is paid and what is still with the contractor.
The same package moves from the subs to the lender. BuildProof checks it at every step and names what is still missing.
The bill goes in with its amounts and any backup the job asks for. Anything missing is named before the CM / GC approves it, and approval asks for this month's lien waiver.
The draft pay package for the owner is built from the schedule of values, with each approved sub bill on its line.
The owner approves the pencil or sends it back with a note on the lines that need a change.
Before the final goes, BuildProof checks for backup on every billed line, current insurance certificates and signed, notarized lien waivers. Anything still open is named.
The lender sees the draw against its own funding checks, with every open item named. The funding decision stays with the lender.
Not everyone logs in. When a sub, owner or lender works by email, the CM / GC enters their figures and paperwork, and the package still carries all of it.
Checks that are easy to miss by hand, run on every monthly package. These are examples; the names and amounts are made up.
A drywall sub's general liability ended Oct 28, and the October package covers work through Oct 31. The final is held for a current certificate, or goes with that exception recorded.
The conditional waiver is signed for $52,800, and this month's bill is $49,280 ($44,350 after retainage). It is named as not matching before the package goes.
Electrical rough-in shows $48,000 billed on a line valued at $42,600. The draft still saves, but it can't be sent until the line is within its value.
Change order 7 for $18,500 is approved by the CM / GC but not yet by the owner. It stays off the package until the owner approves it, or a labelled override is recorded.
A $13,000 sub bill would land on a line with $2,600 left. The line is named, and the CM / GC raises that line's value on the schedule or picks another line.
The plumbing sub's suppliers have sent 2 of 3 conditional waivers. The one still out is named on the bill and on the final's checklist.
What to know before your first project.