Ask what's holding a draw. Every gap is named, none assumed.
Check before you fund. Free, no sign-up:
You: What is holding Draw 8?
BuildProof: One thing: the electrical sub's lien waiver is not signed yet. Every other check is clear.
Draw #8 · Harbor Point, 1 hold: Lien waivers 1 missing; Insurance Current; G702 signed Yes
You: Is it safe to fund?
BuildProof: Not yet: one hold is open. With the waiver in, the checks you set would all clear. Funding is your call.
Funding checks · Draw #8, 7 of 8 clear: Holding Lien waiver; Funded ahead of evidenced work $0.00
You: How much retainage is held?
BuildProof: $1,240,500.00 is held through Draw #8, which is 10% of the work billed.
Retainage · Harbor Point, Through Draw #8: Work billed to date $12,405,000.00; Retainage held (10%) $1,240,500.00
Example. Names and amounts are made up.
What is holding a draw, retainage held, loan balance: each answered from the record.
A missing waiver or an unreadable record shows as a hold, never as a pass.
Set your own funding checks. BuildProof flags what is open; your team decides and funds.
The same package moves from the subs to the lender. BuildProof checks it at every step and names what is still missing.
The bill goes in with its amounts and any backup the job asks for. Anything missing is named before the CM / GC approves it, and approval asks for this month's lien waiver.
The draft pay package for the owner is built from the schedule of values, with each approved sub bill on its line.
The owner approves the pencil or sends it back with a note on the lines that need a change.
Before the final goes, BuildProof checks for backup on every billed line, current insurance certificates and signed, notarized lien waivers. Anything still open is named.
The lender sees the draw against its own funding checks, with every open item named. The funding decision stays with the lender.
Not everyone logs in. When a sub, owner or lender works by email, the CM / GC enters their figures and paperwork, and the package still carries all of it.
Checks that are easy to miss by hand, run on every monthly package. These are examples; the names and amounts are made up.
A drywall sub's general liability ended Oct 28, and the October package covers work through Oct 31. The final is held for a current certificate, or goes with that exception recorded.
The conditional waiver is signed for $52,800, and this month's bill is $49,280 ($44,350 after retainage). It is named as not matching before the package goes.
Electrical rough-in shows $48,000 billed on a line valued at $42,600. The draft still saves, but it can't be sent until the line is within its value.
Change order 7 for $18,500 is approved by the CM / GC but not yet by the owner. It stays off the package until the owner approves it, or a labelled override is recorded.
A $13,000 sub bill would land on a line with $2,600 left. The line is named, and the CM / GC raises that line's value on the schedule or picks another line.
The plumbing sub's suppliers have sent 2 of 3 conditional waivers. The one still out is named on the bill and on the final's checklist.
What to know before your first project.