BuildProofBuildProof
I'm a

Your monthly pay package, prepared and checked.

BuildProof builds the requisition, chases the missing paperwork and flags billing errors before you send.

Free for 45 days. No credit card required.Try it completely free for 45 days.
Ask BuildProofExample project: Harbor Point Residences
  1. You: Build October's req. Concrete at ninety percent, drywall at forty.

    BuildProof: Done. Twelve subs, a hundred eighty-four lines. Everything foots.

    Req #4 · Oct 2026, Draft: Billed this period $418,650.00; Retainage held (10%) $41,865.00; Due after retainage $376,785.00

  2. You: Chase the backup and send the pencil.

    BuildProof: Asked 3 subs for open waivers and 2 for current insurance. The pencil is ready; it goes to the owner when you tap.

    Send the pencil to the owner, Needs your tap: To owner@example.com; Still open 3 waivers, 2 certificates. Button: Confirm and send

  3. You: Create the SOV from this budget.

    BuildProof: Added 42 lines as a new section, and the total matches the file. Nothing is billed yet.

    Schedule of values, Added: Lines added 42; Total $6,840,000.00

Example. Names and amounts are made up.

Type what you need. BuildProof prepares the package, asks your subs for what is missing and flags a line billed past its value. The send stays your tap.

  • Type it, review it, tap to send

    Draft work happens the moment you ask, with Undo. Anything that goes to the owner or lender waits for your tap.

  • The backup gets chased

    Open waivers and expiring insurance are named, and the subs who owe them are asked.

  • The math is code, not a guess

    Every dollar comes from your records. The AI explains and drafts. It never signs, approves or moves money.

From the sub's bill to the lender's decision

The same package moves from the subs to the lender. BuildProof checks it at every step and names what is still missing.

  1. Step 1, Subcontractor: Sends the bill

    The bill goes in with its amounts and any backup the job asks for. Anything missing is named before the CM / GC approves it, and approval asks for this month's lien waiver.

  2. Step 2, CM / GC: Builds the pencil

    The draft pay package for the owner is built from the schedule of values, with each approved sub bill on its line.

  3. Step 3, Owner: Reviews line by line

    The owner approves the pencil or sends it back with a note on the lines that need a change.

  4. Step 4, CM / GC: Sends the final

    Before the final goes, BuildProof checks for backup on every billed line, current insurance certificates and signed, notarized lien waivers. Anything still open is named.

  5. Step 5, Lender: Reviews and decides

    The lender sees the draw against its own funding checks, with every open item named. The funding decision stays with the lender.

Not everyone logs in. When a sub, owner or lender works by email, the CM / GC enters their figures and paperwork, and the package still carries all of it.

What it catches

Checks that are easy to miss by hand, run on every monthly package. These are examples; the names and amounts are made up.

  • Insurance that ended before the month did

    A drywall sub's general liability ended Oct 28, and the October package covers work through Oct 31. The final is held for a current certificate, or goes with that exception recorded.

  • A lien waiver that doesn't match the bill

    The conditional waiver is signed for $52,800, and this month's bill is $49,280 ($44,350 after retainage). It is named as not matching before the package goes.

  • A line billed past its value

    Electrical rough-in shows $48,000 billed on a line valued at $42,600. The draft still saves, but it can't be sent until the line is within its value.

  • A change order the owner hasn't approved yet

    Change order 7 for $18,500 is approved by the CM / GC but not yet by the owner. It stays off the package until the owner approves it, or a labelled override is recorded.

  • A sub bill bigger than what's left on its line

    A $13,000 sub bill would land on a line with $2,600 left. The line is named, and the CM / GC raises that line's value on the schedule or picks another line.

  • A supplier waiver still missing

    The plumbing sub's suppliers have sent 2 of 3 conditional waivers. The one still out is named on the bill and on the final's checklist.

Common questions

What to know before your first project.