Ask what's billed, what's backed up and what's waiting on you.
Check before you approve. Free, no sign-up:
You: What is waiting on me?
BuildProof: Two things: Req #4 needs your review, and change order 3 needs your approval.
Waiting for you, 2 items: Req #4 · Oct 2026 $376,785.00; Change order 3 $38,400.00
You: Is anything billed that isn't done?
BuildProof: I can't see the site, so I checked the numbers: no line is billed past its scheduled value, and 3 lines are billed at 90% or more and worth a walk.
Worth a walk, 3 lines: Roofing 95% billed; Concrete 92% billed; Framing 90% billed
You: Approve the pencil.
BuildProof: Here is the approval for Req #4. Nothing is approved until you tap.
Approve the pencil · Req #4, Needs your tap: Due after retainage $376,785.00; Change orders on it None. Button: Confirm approval
Example. Names and amounts are made up.
Ask a question and get one sentence and a card, not a binder.
The billed amount sits next to its backup and your earlier approvals.
Approvals wait for your tap, and each decision stays on the record.
The same package moves from the subs to the lender. BuildProof checks it at every step and names what is still missing.
The bill goes in with its amounts and any backup the job asks for. Anything missing is named before the CM / GC approves it, and approval asks for this month's lien waiver.
The draft pay package for the owner is built from the schedule of values, with each approved sub bill on its line.
The owner approves the pencil or sends it back with a note on the lines that need a change.
Before the final goes, BuildProof checks for backup on every billed line, current insurance certificates and signed, notarized lien waivers. Anything still open is named.
The lender sees the draw against its own funding checks, with every open item named. The funding decision stays with the lender.
Not everyone logs in. When a sub, owner or lender works by email, the CM / GC enters their figures and paperwork, and the package still carries all of it.
Checks that are easy to miss by hand, run on every monthly package. These are examples; the names and amounts are made up.
A drywall sub's general liability ended Oct 28, and the October package covers work through Oct 31. The final is held for a current certificate, or goes with that exception recorded.
The conditional waiver is signed for $52,800, and this month's bill is $49,280 ($44,350 after retainage). It is named as not matching before the package goes.
Electrical rough-in shows $48,000 billed on a line valued at $42,600. The draft still saves, but it can't be sent until the line is within its value.
Change order 7 for $18,500 is approved by the CM / GC but not yet by the owner. It stays off the package until the owner approves it, or a labelled override is recorded.
A $13,000 sub bill would land on a line with $2,600 left. The line is named, and the CM / GC raises that line's value on the schedule or picks another line.
The plumbing sub's suppliers have sent 2 of 3 conditional waivers. The one still out is named on the bill and on the final's checklist.
What to know before your first project.