West Virginia Lien Waiver Form & Requirements
What a contractor, sub or supplier in West Virginia needs to know about lien waivers and lien deadlines, in plain words, with the statute for each point.
Is there a required West Virginia lien waiver form?
No required statutory form was found for West Virginia (W. Va. Code ch. 38, art. 2 (no statutory waiver form)). Parties can use their own wording, but it should be clear about the payment, the period and the amount.
West Virginia has no required waiver form. Sections 38-2-36 and 38-2-37 cover releasing a lien that is already recorded, and 38-2-24 gives a bond form. Check this point in the statute.
Statute: W. Va. Code ch. 38, art. 2 (no statutory waiver form)
Does a West Virginia lien waiver need to be notarized?
No notary requirement was found in the statute for a waiver.
Statute: W. Va. Code ch. 38, art. 2 (no statutory waiver form)
Conditional vs unconditional in West Virginia
A conditional waiver gives up lien rights only once the payment actually clears. Sign it when you send a bill or before the check arrives. An unconditional waiver gives up the rights the moment you sign, paid or not. Sign it only after the money is in your account.
West Virginia has no required form, so read the waiver you are handed and check which type it is before you sign. More on conditional vs unconditional.
West Virginia mechanics lien deadlines
| Step | Deadline | Statute |
|---|---|---|
| Preliminary notice | No general requirement found | - |
| Lien filing - general contractor | 100 days after completion of the work Record the notice of lien within 100 days after the contractor finishes its work under the contract. | W. Va. Code 38-2-8 |
| Lien filing - subcontractor | 100 days after completion of the work Serve the owner and record within 100 days after the subcontract work is finished. | W. Va. Code 38-2-9 |
| Suit to enforce the lien | 6 months after the lien being recorded Sue in circuit court within 6 months after filing the notice of lien. | W. Va. Code 38-2-34 |
Who gives notice: No preliminary notice is required. Under 38-2-20, a laborer or supplier hired by a contractor may choose to tell the owner in writing, before starting work, that it will look to the owner for payment. Subs serve the owner with the notice of lien within the 100-day window (38-2-9).
Deadlines are strict. Missing one usually ends the lien right for good. Count from the event the statute names, and check the statute for weekends, holidays and recording rules.
Residential work in West Virginia
Check this point in the statute.
Frequently asked
Is there a required West Virginia lien waiver form?
No required statutory form was found for West Virginia (W. Va. Code ch. 38, art. 2 (no statutory waiver form)). Parties can use their own wording, but it should be clear about the payment, the period and the amount. This is a reference to check, not legal advice.
Does a West Virginia lien waiver need to be notarized?
No notary requirement was found in the statute for a waiver. Statute: W. Va. Code ch. 38, art. 2 (no statutory waiver form). This is a reference to check, not legal advice.
How long do I have to file a mechanics lien in West Virginia?
General contractor: 100 days after completion of the work (W. Va. Code 38-2-8). Subcontractor: 100 days after completion of the work (W. Va. Code 38-2-9). Check the statute before you rely on these dates.
Does West Virginia require a preliminary notice?
No general preliminary notice requirement was found. No preliminary notice is required. Under 38-2-20, a laborer or supplier hired by a contractor may choose to tell the owner in writing, before starting work, that it will look to the owner for payment. Subs serve the owner with the notice of lien within the 100-day window (38-2-9).
Sources
- https://code.wvlegislature.gov/38-2-8/
- https://code.wvlegislature.gov/38-2-9/
- https://code.wvlegislature.gov/38-2-34/
- https://code.wvlegislature.gov/38-2/
- https://code.wvlegislature.gov/38-2-20/
Confidence: high. This is a reference to check, not legal advice. Check the statute named on each point before you rely on it. As of 2026-11-19.