What a contractor, sub or supplier in Washington needs to know about lien waivers and lien deadlines, in plain words, with the statute for each point.
Is there a required Washington lien waiver form?
No required statutory form was found for Washington (RCW ch. 60.04 (no statutory waiver form)). Parties can use their own wording, but it should be clear about the payment, the period and the amount.
Washington has no statutory waiver form.
Statute: RCW ch. 60.04 (no statutory waiver form)
Does a Washington lien waiver need to be notarized?
No notary requirement was found in the statute for a waiver.
Statute: RCW ch. 60.04 (no statutory waiver form)
Conditional vs unconditional in Washington
A conditional waiver gives up lien rights only once the payment actually clears. Sign it when you send a bill or before the check arrives. An unconditional waiver gives up the rights the moment you sign, paid or not. Sign it only after the money is in your account.
Washington has no required form, so read the waiver you are handed and check which type it is before you sign. More on conditional vs unconditional.
Washington mechanics lien deadlines
| Step | Deadline | Statute |
|---|---|---|
| Preliminary notice | 60 days after first furnishing (the first day you worked or delivered) You may give notice to the owner at any time, but it covers only work furnished in the 60 days before the notice. For a new single-family home, it is 10 days. Earlier work is not covered. Without a required notice, you cannot enforce the lien. | RCW 60.04.031 |
| Lien filing - general contractor | 90 days after last furnishing (the last day you worked or delivered) Record within 90 days after you stop furnishing labor, services, materials, or equipment. | RCW 60.04.091 |
| Lien filing - subcontractor | 90 days after last furnishing (the last day you worked or delivered) The same 90-day rule applies. | RCW 60.04.091 |
| Suit to enforce the lien | 8 months after the lien being recorded Sue within 8 calendar months after recording. If the lien states a credit term, the 8 months run from the end of that term. Serve the owner within 90 days after filing the lawsuit. | RCW 60.04.141 |
Who gives notice: Subs and suppliers with no direct contract with the owner. Exempt: anyone who contracts directly with the owner, laborers, and subs who contract directly with the prime contractor (except under 3(b)).
Deadlines are strict. Missing one usually ends the lien right for good. Count from the event the statute names, and check the statute for weekends, holidays and recording rules.
Residential work in Washington
On residential work, the prime contractor must give the owner the model disclosure statement.
Frequently asked
Is there a required Washington lien waiver form?
No required statutory form was found for Washington (RCW ch. 60.04 (no statutory waiver form)). Parties can use their own wording, but it should be clear about the payment, the period and the amount. This is a reference to check, not legal advice.
Does a Washington lien waiver need to be notarized?
No notary requirement was found in the statute for a waiver. Statute: RCW ch. 60.04 (no statutory waiver form). This is a reference to check, not legal advice.
How long do I have to file a mechanics lien in Washington?
General contractor: 90 days after last furnishing (the last day you worked or delivered) (RCW 60.04.091). Subcontractor: 90 days after last furnishing (the last day you worked or delivered) (RCW 60.04.091). Check the statute before you rely on these dates.
Does Washington require a preliminary notice?
Yes for the parties the statute names: 60 days after first furnishing (the first day you worked or delivered) (RCW 60.04.031). Subs and suppliers with no direct contract with the owner. Exempt: anyone who contracts directly with the owner, laborers, and subs who contract directly with the prime contractor (except under 3(b)).
Sources
- https://app.leg.wa.gov/RCW/default.aspx?cite=60.04.091
- https://app.leg.wa.gov/RCW/default.aspx?cite=60.04.141
- https://app.leg.wa.gov/RCW/default.aspx?cite=60.04.031
Confidence: high. This is a reference to check, not legal advice. Check the statute named on each point before you rely on it. As of 2026-11-19.