Is there a required North Dakota lien waiver form?

No required statutory form was found for North Dakota (N.D.C.C. 35-27-02(3)). Parties can use their own wording, but it should be clear about the payment, the period and the amount.

North Dakota has no statutory waiver form. Under 35-27-02(3), no lien arises when the owner holds a valid signed waiver. The statute prescribes no form.

Statute: N.D.C.C. 35-27-02(3)

Does a North Dakota lien waiver need to be notarized?

No notary requirement was found in the statute for a waiver.

Statute: N.D.C.C. 35-27-02(3)

Conditional vs unconditional in North Dakota

A conditional waiver gives up lien rights only once the payment actually clears. Sign it when you send a bill or before the check arrives. An unconditional waiver gives up the rights the moment you sign, paid or not. Sign it only after the money is in your account.

North Dakota has no required form, so read the waiver you are handed and check which type it is before you sign. More on conditional vs unconditional.

North Dakota mechanics lien deadlines

StepDeadlineStatute
Preliminary noticeNo general requirement found-
Lien filing - general contractor90 days after last furnishing (the last day you worked or delivered)
Record the lien within 90 days after all of your work or materials are done. A late lien still binds the owner, except against good-faith buyers and lenders, and except for amounts the owner paid before you recorded. You can never file more than 3 years after the first material is furnished.
N.D.C.C. 35-27-13, 35-27-14
Lien filing - subcontractor90 days after last furnishing (the last day you worked or delivered)
Subcontractors have the same 90-day deadline and the same 3-year outer limit from first furnishing.
N.D.C.C. 35-27-13, 35-27-14
Suit to enforce the lien36 months after the lien being recorded
File suit and record a lis pendens within 3 years after recording the lien. If the owner delivers and files a written demand, you must do this within 30 days of delivery, or you lose the lien.
N.D.C.C. 35-27-25

Who gives notice: No preliminary notice is required. A 15-day notice of intent was not found in the current statute. Check this point in the statute.

Deadlines are strict. Missing one usually ends the lien right for good. Count from the event the statute names, and check the statute for weekends, holidays and recording rules.

Residential work in North Dakota

Residential notice rules may differ. Check this point in the statute.

Frequently asked

Is there a required North Dakota lien waiver form?

No required statutory form was found for North Dakota (N.D.C.C. 35-27-02(3)). Parties can use their own wording, but it should be clear about the payment, the period and the amount. This is a reference to check, not legal advice.

Does a North Dakota lien waiver need to be notarized?

No notary requirement was found in the statute for a waiver. Statute: N.D.C.C. 35-27-02(3). This is a reference to check, not legal advice.

How long do I have to file a mechanics lien in North Dakota?

General contractor: 90 days after last furnishing (the last day you worked or delivered) (N.D.C.C. 35-27-13, 35-27-14). Subcontractor: 90 days after last furnishing (the last day you worked or delivered) (N.D.C.C. 35-27-13, 35-27-14). Check the statute before you rely on these dates.

Does North Dakota require a preliminary notice?

No general preliminary notice requirement was found. No preliminary notice is required. A 15-day notice of intent was not found in the current statute. Check this point in the statute.

Sources

Confidence: high. This is a reference to check, not legal advice. Check the statute named on each point before you rely on it. As of 2026-11-19.