BuildProofLien guide Free tools BuildProof.com

Louisiana Lien Waiver Form & Requirements

What a contractor, sub or supplier in Louisiana needs to know about lien waivers and lien deadlines, in plain words, with the statute for each point.

This is a reference to check, not legal advice. Check the statute named on each point before you rely on it. As of 2026-11-19.
Make a Louisiana lien waiver - free Calculate your Louisiana lien deadlines

Is there a required Louisiana lien waiver form?

No required statutory form was found for Louisiana (none identified). Parties can use their own wording, but it should be clear about the payment, the period and the amount.

We found no statutory waiver form. Our search was not in depth. Check this point in the statute.

Statute: none identified

Does a Louisiana lien waiver need to be notarized?

No notary requirement was found in the statute for a waiver.

Statute: none identified

Conditional vs unconditional in Louisiana

A conditional waiver gives up lien rights only once the payment actually clears. Sign it when you send a bill or before the check arrives. An unconditional waiver gives up the rights the moment you sign, paid or not. Sign it only after the money is in your account.

Louisiana has no required form, so read the waiver you are handed and check which type it is before you sign. More on conditional vs unconditional.

Louisiana mechanics lien deadlines

StepDeadlineStatute
Preliminary notice75 days after the last day of the month you last furnished
This applies when a notice of contract was filed on time. A seller of materials to a sub must send a notice of nonpayment to the owner and the contractor. The deadline is 75 days after the last day of the calendar month the materials were delivered. A seller who sends no notice loses its claim or privilege. The old 9:4802(G) was repealed by Acts 2019, No. 325, effective Jan. 1, 2020.
La. R.S. 9:4804(C)
Lien filing - general contractor60 days after completion of the work
If no notice of contract was filed: file the statement within 60 days after a notice of termination is filed. If no notice of termination is filed, the 60 days run from substantial completion or abandonment. If a notice of contract was filed: the GC has 60 days after the notice of termination. If no notice of termination is filed, the GC has 7 months after substantial completion.
La. R.S. 9:4822(A), (C)
Lien filing - subcontractor60 days after completion of the work
If no notice of contract was filed: 60 days after the notice of termination, or after substantial completion or abandonment. If a notice of contract was filed: 30 days after the notice of termination. If no notice of termination is filed, 6 months after substantial completion.
La. R.S. 9:4822(A), (B)
Suit to enforce the lien12 months after the lien being recorded
Sue within 1 year after filing the statement of claim or privilege.
La. R.S. 9:4823(A)(2)

Who gives notice: Sellers of materials to subs, when a notice of contract was filed.

Deadlines are strict. Missing one usually ends the lien right for good. Count from the event the statute names, and check the statute for weekends, holidays and recording rules.

Residential work in Louisiana

Residential notice rules are different (La. R.S. 9:4822). Check this point in the statute.

Frequently asked

Is there a required Louisiana lien waiver form?

No required statutory form was found for Louisiana (none identified). Parties can use their own wording, but it should be clear about the payment, the period and the amount. This is a reference to check, not legal advice.

Does a Louisiana lien waiver need to be notarized?

No notary requirement was found in the statute for a waiver. Statute: none identified. This is a reference to check, not legal advice.

How long do I have to file a mechanics lien in Louisiana?

General contractor: 60 days after completion of the work (La. R.S. 9:4822(A), (C)). Subcontractor: 60 days after completion of the work (La. R.S. 9:4822(A), (B)). Check the statute before you rely on these dates.

Does Louisiana require a preliminary notice?

Yes for the parties the statute names: 75 days after the last day of the month you last furnished (La. R.S. 9:4804(C)). Sellers of materials to subs, when a notice of contract was filed.

Sources

Confidence: high. This is a reference to check, not legal advice. Check the statute named on each point before you rely on it. As of 2026-11-19.

All states

More free tools
Lien Waiver GeneratorConditional and unconditional, progress and final Lien Deadline CalculatorYour notice and filing dates by state Retainage CalculatorStep-downs and what is held