Indiana Lien Waiver Form & Requirements

What a contractor, sub or supplier in Indiana needs to know about lien waivers and lien deadlines, in plain words, with the statute for each point.

This is a reference to check, not legal advice. Check the statute named on each point before you rely on it. As of 2026-11-19.
Make an Indiana lien waiver - free Calculate your Indiana lien deadlines

Is there a required Indiana lien waiver form?

No required statutory form was found for Indiana (none identified). Parties can use their own wording, but it should be clear about the payment, the period and the amount.

Indiana has no statutory waiver form. A lien waiver signed in advance as part of a contract is void (IC 32-28-3-16; check this point in the statute).

Statute: none identified

Does an Indiana lien waiver need to be notarized?

No notary requirement was found in the statute for a waiver.

Statute: none identified

Conditional vs unconditional in Indiana

A conditional waiver gives up lien rights only once the payment actually clears. Sign it when you send a bill or before the check arrives. An unconditional waiver gives up the rights the moment you sign, paid or not. Sign it only after the money is in your account.

Indiana has no required form, so read the waiver you are handed and check which type it is before you sign. More on conditional vs unconditional.

Indiana mechanics lien deadlines

StepDeadlineStatute
Preliminary noticeNo general requirement found-
Lien filing - general contractor90 days after last furnishing (the last day you worked or delivered)
File within 90 days after you perform labor or supply materials (nonresidential work).
IC 32-28-3-3(a)
Lien filing - subcontractor90 days after last furnishing (the last day you worked or delivered)
Same as the GC.
IC 32-28-3-3(a)
Suit to enforce the lien12 months after the lien being recorded
Sue within 1 year after you record the lien statement, or after a written, recorded credit runs out. An owner's notice can cut this to 30 days (IC 32-28-3-10; check this point in the statute).
IC 32-28-3-6

Who gives notice: None on commercial work. On residential work, a sub must give a pre-lien notice.

Deadlines are strict. Missing one usually ends the lien right for good. Count from the event the statute names, and check the statute for weekends, holidays and recording rules.

Residential work in Indiana

For Class 2 (residential) structures, the deadline is 60 days (IC 32-28-3-3(b)), and pre-lien notice rules apply.

Frequently asked

Is there a required Indiana lien waiver form?

No required statutory form was found for Indiana (none identified). Parties can use their own wording, but it should be clear about the payment, the period and the amount. This is a reference to check, not legal advice.

Does an Indiana lien waiver need to be notarized?

No notary requirement was found in the statute for a waiver. Statute: none identified. This is a reference to check, not legal advice.

How long do I have to file a mechanics lien in Indiana?

General contractor: 90 days after last furnishing (the last day you worked or delivered) (IC 32-28-3-3(a)). Subcontractor: 90 days after last furnishing (the last day you worked or delivered) (IC 32-28-3-3(a)). Check the statute before you rely on these dates.

Does Indiana require a preliminary notice?

No general preliminary notice requirement was found. None on commercial work. On residential work, a sub must give a pre-lien notice.

Sources

Confidence: high. This is a reference to check, not legal advice. Check the statute named on each point before you rely on it. As of 2026-11-19.