Connecticut Lien Waiver Form & Requirements

What a contractor, sub or supplier in Connecticut needs to know about lien waivers and lien deadlines, in plain words, with the statute for each point.

This is a reference to check, not legal advice. Check the statute named on each point before you rely on it. As of 2026-11-19.
Make a Connecticut lien waiver - free Calculate your Connecticut lien deadlines

Is there a required Connecticut lien waiver form?

No required statutory form was found for Connecticut (Conn. Gen. Stat. 49-33 et seq.). Parties can use their own wording, but it should be clear about the payment, the period and the amount.

Connecticut has no required waiver form. The only waiver language in chapter 847 is in 49-33, and it deals with priority, not a form. Waivers signed in advance are generally restricted.

Statute: Conn. Gen. Stat. 49-33 et seq.

Does a Connecticut lien waiver need to be notarized?

No notary requirement was found in the statute for a waiver.

Statute: Conn. Gen. Stat. 49-33 et seq.

Conditional vs unconditional in Connecticut

A conditional waiver gives up lien rights only once the payment actually clears. Sign it when you send a bill or before the check arrives. An unconditional waiver gives up the rights the moment you sign, paid or not. Sign it only after the money is in your account.

Connecticut has no required form, so read the waiver you are handed and check which type it is before you sign. More on conditional vs unconditional.

Connecticut mechanics lien deadlines

StepDeadlineStatute
Preliminary noticeNo general requirement found-
Lien filing - general contractor90 days after last furnishing (the last day you worked or delivered)
Record a sworn certificate with the town clerk within 90 days after you stop work or stop supplying materials. Serve a copy on the owner within 30 days after recording.
Conn. Gen. Stat. 49-34
Lien filing - subcontractor90 days after last furnishing (the last day you worked or delivered)
Within 90 days after you stop work, the same as the GC. The 49-35 notice of intent is also due within those 90 days.
Conn. Gen. Stat. 49-34; 49-35
Suit to enforce the lien12 months after the lien being recorded
Start the foreclosure suit and record a lis pendens within one year after recording the lien. If someone filed an application under 49-35a, you have until 60 days after the court finally decides it, if that is later. If you miss the deadline, the lien is discharged.
Conn. Gen. Stat. 49-39

Who gives notice: Connecticut has no preliminary notice on private commercial work. A sub or supplier without a direct contract with the owner must serve the owner (and the original contractor) with notice of its lien within 90 days after it stops furnishing (Conn. Gen. Stat. 49-35(a)). That notice goes with the lien itself.

Deadlines are strict. Missing one usually ends the lien right for good. Count from the event the statute names, and check the statute for weekends, holidays and recording rules.

Residential work in Connecticut

The 49-35 notice of intent applies to claimants with no direct contract with the owner. Rules specific to homes were not reviewed. Check this point in the statute.

Frequently asked

Is there a required Connecticut lien waiver form?

No required statutory form was found for Connecticut (Conn. Gen. Stat. 49-33 et seq.). Parties can use their own wording, but it should be clear about the payment, the period and the amount. This is a reference to check, not legal advice.

Does a Connecticut lien waiver need to be notarized?

No notary requirement was found in the statute for a waiver. Statute: Conn. Gen. Stat. 49-33 et seq.. This is a reference to check, not legal advice.

How long do I have to file a mechanics lien in Connecticut?

General contractor: 90 days after last furnishing (the last day you worked or delivered) (Conn. Gen. Stat. 49-34). Subcontractor: 90 days after last furnishing (the last day you worked or delivered) (Conn. Gen. Stat. 49-34; 49-35). Check the statute before you rely on these dates.

Does Connecticut require a preliminary notice?

No general preliminary notice requirement was found. Connecticut has no preliminary notice on private commercial work. A sub or supplier without a direct contract with the owner must serve the owner (and the original contractor) with notice of its lien within 90 days after it stops furnishing (Conn. Gen. Stat. 49-35(a)). That notice goes with the lien itself.

Sources

Confidence: high. This is a reference to check, not legal advice. Check the statute named on each point before you rely on it. As of 2026-11-19.